top of page

Specialty & Defense Builds

Architectural Structure

Mike Mitchell Construction spent years building some of the most challenging projects, earning a wealth of knowledge and experience in: 

​

  • Clean Rooms to Class 10

  • Labs

  • Change Rooms

  • Entry Air Dams

  • Computer & IT Rooms (Raised Floor Cooling Systems)

  • SCIF Rooms

  • Building Entry Man Trap Room

  • HVAC Systems (Temperature & Humidity +/- 1 degree and 1%)

  • Electrical Systems (Including Aircraft Military Voltage for Testing)

  • T-Bar Systems (Light and Heavy Duty)  

  • ESD Flooring (Fast and Slow Dissipating)

  • Static Grounding Systems

  • Specialized Gas Tubing (Single, Double, and Triple Containment)

    • Orbital Welding

    • Tubing Sanitation and Testing

  • Specialized Gas Systems (Large Nitrogen Tanks, Etc.)

  • Gas Alarms Systems (Including Shut off Gas Containment Tubing Systems)

  • Monitoring Systems

  • Fume Hoods

  • Scrubber Systems

  • Acid Neutralizing Systems

  • Acid Waste Piping Installation

  • DI Water Systems

  • RO Water Systems

  • Specialized Equipment Installation

  • Anti-Vibration Tables and Systems

  • UPS Systems

  • Engineered Isolation Pads

bottom of page